About East Troy Municipal Airport

Located approximately 30 miles southwest of Milwaukee, Wisconsin, the East Troy Municipal Airport (57C) is a general aviation airport that features two runways. Runway 8-26 is a paved runway that is 3,900 feet long and 75 feet wide. Runway 18-36 is a turf runway that is 2,446 feet long and 75 feet wide. The airport is used for general aviation and business flights to and from the area and is home to multiple aviation related businesses and service providers.

Hangars Alpha transition

Schedule

The master planning process will take place in phases and will include meetings with community members and leaders, airport business, and other stakeholders.

Master Plan Documents

All master plan documents will be available on this study site as they are completed in a downloadable PDF format.

Public Involvement

Ensuring that the public is both informed and involved is critical to the success of the master planning process, and there will be several meetings held throughout the study.

FAQs

You have questions, we have answers! From who is funding the plan to who is doing the it to the parts of the plan, we have you covered.

Comments/Questions

If you have a comment or question, please do not hesitate to reach out! You can either use the provided form, or send an email to a member of the project team.

About the Master Plan

An Airport Master Plan is a document that helps to guide the direction of public use airports, such as East Troy Municipal Airport, by looking at factors such as:

  • Current and potential future demand
  • Efficiency and safety of airport operations
  • Land use on and around the airport
  • Future growth and ways to generate revenue.

It is a proactive document that identifies and then plans for future facility needs to ensure that airport management can coordinate project approvals, design, financing, and construction to avoid experiencing detrimental effects due to inadequate facilities.

The ultimate goal of the study is to provide systematic guidelines for the airport’s overall maintenance, development, and operation, all while taking into consideration the community it serves.

Schedule

Winter 2023
Winter 2023
Spring 2024
May 28, 2024
Summer/Fall 2024
Summer/Fall 2024
TBD
TBD
TBD
TBD
TBD
INITIATION
  • Goals and Objectives
  • Project Website
  • Establish Planning Advisory Committee (PAC)
INITIATION MEETINGS
  • Kick-Off Meeting #1
PHASE 1
  • Inventory of Existing Conditions
  • Aviation Demand Forecasts
  • Facility Requirements
PHASE 1 DOCUMENTS
AND MEETINGS
  • Discussion of Phase 1 working papers
  • PAC meeting #1
PHASE 2
  • Airport Development Alternatives
PHASE 2 DOCUMENTS
AND MEETINGS
  • Discussion of Phase 2 working papers
  • PAC meeting #2
  • Public Information Workshop #1 (Sept. 17, 2024)
PHASE 3
  • Recommended Concept & Environmental Considerations
  • Capital Improvement Program
PHASE 3 DOCUMENTS
AND MEETINGS
  • Discussion of Phase 3 working papers
  • PAC meeting #3
  • Public Information Workshop #2
DRAFT FINAL
MASTER PLAN
APPROVAL PROCESS
  • Local approval of master plan
  • FAA approval of ALP
FINAL MASTER PLAN

Master Plan Documents

Draft chapters will be posted as the study progresses. Files will be in PDF format and available for download and print.

Download by Chapter

Public Involvement

The approach to involve the community is multi-faceted. The Public Advisory Committee (PAC) is a group of airport stakeholders who have been asked to volunteer their time to aid in the development of the Master Plan. The PAC will be convened for three (3) meetings to review draft chapters as developed by the consultant team. The same draft chapters made available to the PAC will be posted to this project website.

There will also be two (2) public information workshops during the study process. The workshops will be conducted in an open-house format where the public can visit with the project team and ask any questions they may have related to the project. The workshops are typically scheduled in the early evening to allow those heading home from work to stop by, or to allow others to come after the dinner hour. The date and time of the workshops will be advertised locally and posted on this project website.

Draft chapters of the master plan report will be posted to this dedicated project website so that anyone can learn about the study process and review and comment on the draft material during the study. All community members are encouraged to engage in the process and provide comments to the project team. Interested parties can also utilize the ‘Comment’ feature on this project website. Direct communication with the project managers via phone or email is also acceptable, and their contact information is listed in the ‘Contact Us’ section at the bottom of this website.

Flier advertising the public information workshop on Spetember 17th, 2024 from 5 to 6 pm at East troy municipal airport. 2085 highway L, East Troy, WI 53120
Small antique airplane that is red and yellow
Closeup of airplane propellers
Yellow bi-plane on taxiway